Dedicated To Perfection

8 Step Process

We approach each of our projects with the following 8 step process which consists of estimations, planning & setup, process order, manufacture, inspection, installation, handover and final account.

01

Step

Estimations

Icon

Enquiry is received from either an existing client/designer or a new enquiry this project is then broken down into the various services involved to include joinery manufacture, installation/fit out, metalwork components, electrical, mechanical (AC), flooring, signage, paint/specialist finishes, sprinklers, data & security (intruder, cctv).

Each element is then issued to various sub contractors to tender, whilst the in house elements are costed by our estimator. Once all costs are returned a tender package is prepared and issued to the client for approval.

Should we be successful in being appointed either a letter of intent or purchase order is received.

Estimations

02

Step

Planning & Setup

Icon

Survey //.

A measured survey is carried out of the space, this is then drawn up in Autocad to give an accurate reflection of the shape and size of the space.

Drawing //.

All elements of the project are drawn this includes the actual space, floor plan, elevations of walls & the ceiling plan, also all fixtures and fittings/cabinetry are fully drawn in detail, showing junctions of all finishes be that glass & metalwork, sheet material & laminates/paint finishes.

Approval //.

A full drawing pack is then issued to the clients designer for review, comment & approval.

Sign Off //.

Amendments are made in line with comments received, drawings are then signed off as approved for manufacture.

Planning & Setup

03

Step

Process Order

Icon

All elements within the build are ordered, from sub contractor services to small component parts within a cabinet ie drawer slides, these orders are tracked daily to ensure all parts are received as & when required.

Process Order

04

Step

Manufacture

Icon

Programmes are wrote to allow our in house manufacture via CNC routers and other automated machinery cut out the component part.

These elements are then brought together along with items that will have been bought in, to allow the joinery to be constructed in our workshop.

Finishes are then applied by that laminate, metal or in house spraying.

Manufacture

05

Step

Inspection

Icon

All finished manufactured items of joinery are thoroughly inspected to ensure they meet both ours & our clients exacting standards, items are then wrapped & placed in dispatch/storage until they are ready to go to site.

Inspection

06

Step

Installation

Icon

A full site installation programme is wrote & issued to both the client & all other bodies involved in the manufacture and build, this indicates key dates when various elements need to be carried out to ensure that the overall programme is managed to meet the completion date.

On build DGC installation carry out build based upon previously agreed layouts, this includes the management of all sub contractor trades as previously noted.

Site meetings are held on a weekly basis, whereby the clients representative attends, along with our management team & all other sub contractors to ensure progression of the build is in line with the programme at the same time addressing any on site issues.

Installation

07

Step

Handover

Icon

Meeting takes place on site, where the site is fully inspected, a list of defects/snags is produced.

Snagging is completed & signed off by our client.

Handover

08

Step

Final Account

Icon

A list of all changes be that omissions or additions is pulled together by the estimating team, this is based upon the original tender. This is issued for client approved prior to final invoice being issued.

Final Account